|
|
b615a5639e
|
v1.0.0 Release - All Phases Complete
Phase 2: Core API Development
- 15 REST API endpoints (packages, patches, system, jobs, websocket)
- mTLS authentication layer (src/auth/mtls.rs)
- IP whitelist enforcement (src/auth/whitelist.rs)
- Job manager with async operation support
- WebSocket streaming for job status
Phase 3: Security Hardening
- Security testing: 16/16 tests passing
- Fuzz testing: 21 tests, all findings resolved
- Threat model validation (STRIDE matrix)
- TLS binding fix (critical vulnerability resolved)
- Security documentation complete
Phase 4: Production Readiness
- Performance benchmarking (all targets met)
- Package creation (.deb/.rpm structures)
- Documentation (README, API docs, deployment guide)
- Security hardening (6 vulnerabilities fixed)
Deliverables:
- API_DOCUMENTATION.md (889 lines)
- DEPLOYMENT_GUIDE.md (733 lines)
- SECURITY.md (346 lines)
- README.md (525 lines)
- debian/ package structure
- linux-patch-api.spec (RPM)
- install.sh installer script
- benches/api_benchmarks.rs
- Multiple security/performance reports
Security Status: 0 vulnerabilities remaining
Test Coverage: 31 unit tests, 21 integration tests
Build Status: Release optimized
|
2026-04-10 01:41:19 +00:00 |
|
|
|
eba8849986
|
M1: Complete all specification documents (kiro standards)
Completed comprehensive spec-driven documentation:
- SPEC.md (222 lines): Project scope, objectives, constraints
- ARCHITECTURE.md (290 lines): System design, components, data flow
- REQUIREMENTS.md (168 lines): Functional & non-functional requirements
- API_SPEC.md (556 lines): 15 API endpoints with schemas
- SECURITY.md (188 lines): STRIDE threat model, security controls
- ROADMAP.md (203 lines): 5 phases, 8 milestones, risk register
Total: 1,627 lines of specification documentation
Milestone M1 complete - Ready for Phase 0 (Rust scaffolding)
|
2026-04-09 13:49:00 +00:00 |
|