Private
Public Access
1
0
Commit Graph

3 Commits

Author SHA1 Message Date
03786d1798 v0.2.0: Fix List Jobs bug, TLS 1.3 enforcement, client_disconnect_timeout, RwLock contention
Some checks failed
CI/CD Pipeline / Code Format (push) Failing after 1s
CI/CD Pipeline / Clippy Lints (push) Failing after 2s
CI/CD Pipeline / Unit Tests (push) Failing after 7s
CI/CD Pipeline / Build Debian Package (push) Has been skipped
CI/CD Pipeline / Build Debian Package (Ubuntu 22.04) (push) Has been skipped
CI/CD Pipeline / Build RPM Package (push) Has been skipped
CI/CD Pipeline / Build Alpine Package (push) Has been skipped
CI/CD Pipeline / Build Arch Package (push) Has been skipped
CI/CD Pipeline / Security Audit (push) Failing after 3s
Bug fixes:
- Fix List Jobs connection reset: Add client_disconnect_timeout (5s) to prevent TLS write truncation
- Enforce TLS 1.3 only: Add with_protocol_versions(&[&TLS13]) to rustls ServerConfig
- Fix RwLock contention: Release read lock before sorting in list_jobs()
- Fix systemd service: Remove ProtectSystem=strict (blocks package management)
- Fix systemd service: Change Type=notify to Type=simple (fixes restart hangs)
- Fix systemd service: Add DEBIAN_FRONTEND=noninteractive
- Fix systemd service: Add ReadWritePaths for apt/dpkg paths

CI/CD:
- Add Ubuntu 22.04 build job to CI workflow

E2E Testing:
- Add comprehensive E2E test suite (test_e2e.py)
- Tests cover health, packages, patches, jobs, security, and reboot endpoints

Other:
- Bump version to 0.2.0
- Add lessons learned documentation
2026-05-02 20:59:02 +00:00
65cfb40abb v1.0.0 Release - All Phases Complete
Some checks failed
CI/CD Pipeline / Code Format (push) Has been cancelled
CI/CD Pipeline / Clippy Lints (push) Has been cancelled
CI/CD Pipeline / Unit Tests (push) Has been cancelled
CI/CD Pipeline / Security Audit (push) Has been cancelled
CI/CD Pipeline / Build Release (x86_64-unknown-linux-gnu) (push) Has been cancelled
CI/CD Pipeline / Build Ubuntu Package (push) Has been cancelled
Phase 2: Core API Development
- 15 REST API endpoints (packages, patches, system, jobs, websocket)
- mTLS authentication layer (src/auth/mtls.rs)
- IP whitelist enforcement (src/auth/whitelist.rs)
- Job manager with async operation support
- WebSocket streaming for job status

Phase 3: Security Hardening
- Security testing: 16/16 tests passing
- Fuzz testing: 21 tests, all findings resolved
- Threat model validation (STRIDE matrix)
- TLS binding fix (critical vulnerability resolved)
- Security documentation complete

Phase 4: Production Readiness
- Performance benchmarking (all targets met)
- Package creation (.deb/.rpm structures)
- Documentation (README, API docs, deployment guide)
- Security hardening (6 vulnerabilities fixed)

Deliverables:
- API_DOCUMENTATION.md (889 lines)
- DEPLOYMENT_GUIDE.md (733 lines)
- SECURITY.md (346 lines)
- README.md (525 lines)
- debian/ package structure
- linux-patch-api.spec (RPM)
- install.sh installer script
- benches/api_benchmarks.rs
- Multiple security/performance reports

Security Status: 0 vulnerabilities remaining
Test Coverage: 31 unit tests, 21 integration tests
Build Status: Release optimized
2026-04-10 01:41:19 +00:00
145df1b3c8 Phase 1: Foundation - CI/CD, systemd service, test framework
Some checks failed
CI/CD Pipeline / Code Format (push) Has been cancelled
CI/CD Pipeline / Clippy Lints (push) Has been cancelled
CI/CD Pipeline / Unit Tests (push) Has been cancelled
CI/CD Pipeline / Security Audit (push) Has been cancelled
CI/CD Pipeline / Build Release (x86_64-unknown-linux-gnu) (push) Has been cancelled
CI/CD Pipeline / Build Ubuntu Package (push) Has been cancelled
Completed Phase 1 foundation tasks:
- CI/CD pipeline (.github/workflows/ci.yml)
  - Format check (rustfmt)
  - Clippy lints
  - Unit tests with codecov
  - Security audit (cargo-audit)
  - Build release artifacts
  - Ubuntu package build
- Systemd service file (configs/linux-patch-api.service)
  - Security hardening (ProtectSystem, SystemCallFilter)
  - Journal logging integration
  - Resource limits
- Test framework structure (tests/unit/, tests/integration/)
  - Initial unit test template
  - Test framework verified with cargo test

Rust toolchain 1.94.1 installed and verified.
2026-04-09 19:12:45 +00:00