Completed comprehensive spec-driven documentation: - SPEC.md (222 lines): Project scope, objectives, constraints - ARCHITECTURE.md (290 lines): System design, components, data flow - REQUIREMENTS.md (168 lines): Functional & non-functional requirements - API_SPEC.md (556 lines): 15 API endpoints with schemas - SECURITY.md (188 lines): STRIDE threat model, security controls - ROADMAP.md (203 lines): 5 phases, 8 milestones, risk register Total: 1,627 lines of specification documentation Milestone M1 complete - Ready for Phase 0 (Rust scaffolding)
7.1 KiB
7.1 KiB
Linux_Patch_API - Development Roadmap
Project Timeline Overview
Start Date: 2026-04-09
Target Production: 2026-07-17
Total Duration: 14 weeks (Aggressive timeline)
Phase Strategy: Sequential (no overlap)
Project Phases
Phase 0: Rust Project Scaffolding
Duration: 3 days
Target Date: 2026-04-09 to 2026-04-12
Status: Ready to Start
- Initialize Rust project with Cargo
- Set up project structure (src/, tests/, configs/)
- Configure Cargo.toml with dependencies (actix-web, tokio, openssl, serde, etc.)
- Set up Clippy and rustfmt for code quality
- Create initial module structure (api, auth, jobs, packages, config, logging)
- Configure .gitignore for Rust projects
- Set up initial logging framework
Phase 1: Foundation
Duration: 2 weeks
Target Date: 2026-04-12 to 2026-04-26
Status: Not Started
- Complete all specification documents ✅ (in progress)
- Set up development environment (Rust toolchain, IDE config)
- Initialize git repository ✅ (complete)
- Configure CI/CD pipeline (GitHub Actions or GitLab CI)
- Establish security baseline (dependency scanning, cargo-audit)
- Set up test framework (cargo test, integration test structure)
- Create systemd service file template
- Set up internal CA infrastructure for mTLS certs
Phase 2: Core API Development
Duration: 6 weeks
Target Date: 2026-04-26 to 2026-06-07
Status: Not Started
- Implement mTLS authentication layer
- Implement IP whitelist enforcement
- Build configuration management (YAML loading, validation, auto-reload)
- Build job manager (queue, status tracking, WebSocket broadcast)
- Implement Package Management endpoints:
- GET /api/v1/packages (list/filter/sort)
- GET /api/v1/packages/{name} (details)
- POST /api/v1/packages (install)
- PUT /api/v1/packages/{name} (update)
- DELETE /api/v1/packages/{name} (remove)
- Implement Patch Management endpoints:
- GET /api/v1/patches (list available)
- POST /api/v1/patches/apply (apply patches)
- Implement System endpoints:
- GET /api/v1/system/info
- GET /api/v1/health
- POST /api/v1/system/reboot
- Implement Job Management endpoints:
- GET /api/v1/jobs (list)
- GET /api/v1/jobs/{id} (status)
- POST /api/v1/jobs/{id}/rollback
- Implement WebSocket streaming (/api/v1/ws/jobs)
- Implement audit logging (systemd journal + file fallback)
- Unit test coverage >95%
- Integration tests for all endpoints
Phase 3: Security Hardening
Duration: 3 weeks
Target Date: 2026-06-07 to 2026-06-28
Status: Not Started
- Penetration testing (internal/external)
- Threat model validation (verify all STRIDE mitigations)
- Security control implementation review
- Fuzz testing on API endpoints
- Certificate validation testing
- Config file tampering resistance testing
- Privilege escalation testing
- Fix all security findings
- Security documentation completion
Phase 4: Production Readiness
Duration: 3 weeks
Target Date: 2026-06-28 to 2026-07-17
Status: Not Started
- Performance optimization (benchmarking, profiling)
- Documentation completion (README, deployment guide, API docs)
- Deployment automation (package creation: .deb, .rpm)
- Installation script development
- User acceptance testing
- Final security review
- Production deployment checklist
- Release v1.0.0
Milestones
| Milestone | Description | Target Date | Status |
|---|---|---|---|
| M0 | Phase 0 complete (scaffolding) | 2026-04-12 | ⏳ Pending |
| M1 | All spec documents complete | 2026-04-09 | ✅ Complete |
| M2 | Development environment ready | 2026-04-15 | ⏳ Pending |
| M3 | CI/CD pipeline operational | 2026-04-22 | ⏳ Pending |
| M4 | mTLS + IP whitelist working | 2026-05-03 | ⏳ Pending |
| M5 | Core API functional (Alpha) | 2026-06-07 | ⏳ Pending |
| M6 | Security testing complete (Beta) | 2026-06-28 | ⏳ Pending |
| M7 | Production release (v1.0.0) | 2026-07-17 | ⏳ Pending |
Risk Register
| ID | Risk | Likelihood | Impact | Mitigation Strategy | Owner |
|---|---|---|---|---|---|
| R001 | Rust learning curve delays development | Medium | Medium | Pair programming, Rust documentation, community support | Dev Team |
| R002 | mTLS certificate management complexity | Medium | High | Early CA setup, detailed documentation, testing certs | Security |
| R003 | Package manager API differences across distros | High | Medium | Pluggable backend architecture, extensive testing per distro | Dev Team |
| R004 | Security vulnerabilities in dependencies | Low | High | cargo-audit in CI, regular dependency updates, minimal deps | Security |
| R005 | Performance issues with concurrent jobs | Medium | Medium | Load testing in Phase 3, configurable concurrency limits | Dev Team |
| R006 | Scope creep during development | Medium | High | Strict spec adherence, change control process | PM |
| R007 | Internal CA infrastructure delays | Low | High | Start CA setup in Phase 0, use test certs for development | Security |
| R008 | systemd integration issues | Low | Medium | Early systemd testing, reference existing Rust systemd services | Dev Team |
Resource Requirements
Development Team
| Role | Count | Commitment |
|---|---|---|
| Rust Developer | 1-2 | Full-time |
| Security Engineer | 1 | Part-time (Phases 1, 3, 4) |
| QA/Test Engineer | 1 | Part-time (Phases 2, 3, 4) |
Infrastructure
| Resource | Purpose | Notes |
|---|---|---|
| Development Server | Code development | Ubuntu 22.04 LTS |
| Test Servers | Multi-distro testing | Ubuntu, Debian, RHEL, Alpine, Arch |
| CI/CD Runner | Automated testing | GitHub Actions or self-hosted |
| Internal CA | Certificate issuance | Separate secure host |
Tools & Services
| Tool | Purpose | Cost |
|---|---|---|
| Rust Toolchain | Development | Free |
| cargo-audit | Security scanning | Free |
| Git/Gitea | Version control | Self-hosted |
| Wireshark | Network analysis | Free |
| Burp Suite | Security testing | Community (Free) |
Success Criteria
Phase 0 Success
- Cargo project builds without errors
- All dependencies resolved
- Code quality tools configured and passing
Phase 1 Success
- CI/CD pipeline runs on every commit
- Test framework operational with >95% coverage target
- Internal CA operational with test certificates
Phase 2 Success
- All 15 API endpoints functional
- mTLS authentication working
- IP whitelist enforced
- WebSocket streaming operational
- Audit logging complete
- Unit test coverage >95%
Phase 3 Success
- Penetration testing complete with all critical findings resolved
- Threat model validated
- Security documentation complete
Phase 4 Success
- Performance benchmarks met
- Documentation complete
- Package builds (.deb, .rpm) successful
- UAT sign-off received
- v1.0.0 released
Following kiro spec-driven development standards