Echo eba8849986 M1: Complete all specification documents (kiro standards)
Completed comprehensive spec-driven documentation:
- SPEC.md (222 lines): Project scope, objectives, constraints
- ARCHITECTURE.md (290 lines): System design, components, data flow
- REQUIREMENTS.md (168 lines): Functional & non-functional requirements
- API_SPEC.md (556 lines): 15 API endpoints with schemas
- SECURITY.md (188 lines): STRIDE threat model, security controls
- ROADMAP.md (203 lines): 5 phases, 8 milestones, risk register

Total: 1,627 lines of specification documentation

Milestone M1 complete - Ready for Phase 0 (Rust scaffolding)
2026-04-09 13:49:00 +00:00

7.1 KiB

Linux_Patch_API - Development Roadmap

Project Timeline Overview

Start Date: 2026-04-09
Target Production: 2026-07-17
Total Duration: 14 weeks (Aggressive timeline)
Phase Strategy: Sequential (no overlap)


Project Phases

Phase 0: Rust Project Scaffolding

Duration: 3 days
Target Date: 2026-04-09 to 2026-04-12
Status: Ready to Start

  • Initialize Rust project with Cargo
  • Set up project structure (src/, tests/, configs/)
  • Configure Cargo.toml with dependencies (actix-web, tokio, openssl, serde, etc.)
  • Set up Clippy and rustfmt for code quality
  • Create initial module structure (api, auth, jobs, packages, config, logging)
  • Configure .gitignore for Rust projects
  • Set up initial logging framework

Phase 1: Foundation

Duration: 2 weeks
Target Date: 2026-04-12 to 2026-04-26
Status: Not Started

  • Complete all specification documents (in progress)
  • Set up development environment (Rust toolchain, IDE config)
  • Initialize git repository (complete)
  • Configure CI/CD pipeline (GitHub Actions or GitLab CI)
  • Establish security baseline (dependency scanning, cargo-audit)
  • Set up test framework (cargo test, integration test structure)
  • Create systemd service file template
  • Set up internal CA infrastructure for mTLS certs

Phase 2: Core API Development

Duration: 6 weeks
Target Date: 2026-04-26 to 2026-06-07
Status: Not Started

  • Implement mTLS authentication layer
  • Implement IP whitelist enforcement
  • Build configuration management (YAML loading, validation, auto-reload)
  • Build job manager (queue, status tracking, WebSocket broadcast)
  • Implement Package Management endpoints:
    • GET /api/v1/packages (list/filter/sort)
    • GET /api/v1/packages/{name} (details)
    • POST /api/v1/packages (install)
    • PUT /api/v1/packages/{name} (update)
    • DELETE /api/v1/packages/{name} (remove)
  • Implement Patch Management endpoints:
    • GET /api/v1/patches (list available)
    • POST /api/v1/patches/apply (apply patches)
  • Implement System endpoints:
    • GET /api/v1/system/info
    • GET /api/v1/health
    • POST /api/v1/system/reboot
  • Implement Job Management endpoints:
    • GET /api/v1/jobs (list)
    • GET /api/v1/jobs/{id} (status)
    • POST /api/v1/jobs/{id}/rollback
  • Implement WebSocket streaming (/api/v1/ws/jobs)
  • Implement audit logging (systemd journal + file fallback)
  • Unit test coverage >95%
  • Integration tests for all endpoints

Phase 3: Security Hardening

Duration: 3 weeks
Target Date: 2026-06-07 to 2026-06-28
Status: Not Started

  • Penetration testing (internal/external)
  • Threat model validation (verify all STRIDE mitigations)
  • Security control implementation review
  • Fuzz testing on API endpoints
  • Certificate validation testing
  • Config file tampering resistance testing
  • Privilege escalation testing
  • Fix all security findings
  • Security documentation completion

Phase 4: Production Readiness

Duration: 3 weeks
Target Date: 2026-06-28 to 2026-07-17
Status: Not Started

  • Performance optimization (benchmarking, profiling)
  • Documentation completion (README, deployment guide, API docs)
  • Deployment automation (package creation: .deb, .rpm)
  • Installation script development
  • User acceptance testing
  • Final security review
  • Production deployment checklist
  • Release v1.0.0

Milestones

Milestone Description Target Date Status
M0 Phase 0 complete (scaffolding) 2026-04-12 Pending
M1 All spec documents complete 2026-04-09 Complete
M2 Development environment ready 2026-04-15 Pending
M3 CI/CD pipeline operational 2026-04-22 Pending
M4 mTLS + IP whitelist working 2026-05-03 Pending
M5 Core API functional (Alpha) 2026-06-07 Pending
M6 Security testing complete (Beta) 2026-06-28 Pending
M7 Production release (v1.0.0) 2026-07-17 Pending

Risk Register

ID Risk Likelihood Impact Mitigation Strategy Owner
R001 Rust learning curve delays development Medium Medium Pair programming, Rust documentation, community support Dev Team
R002 mTLS certificate management complexity Medium High Early CA setup, detailed documentation, testing certs Security
R003 Package manager API differences across distros High Medium Pluggable backend architecture, extensive testing per distro Dev Team
R004 Security vulnerabilities in dependencies Low High cargo-audit in CI, regular dependency updates, minimal deps Security
R005 Performance issues with concurrent jobs Medium Medium Load testing in Phase 3, configurable concurrency limits Dev Team
R006 Scope creep during development Medium High Strict spec adherence, change control process PM
R007 Internal CA infrastructure delays Low High Start CA setup in Phase 0, use test certs for development Security
R008 systemd integration issues Low Medium Early systemd testing, reference existing Rust systemd services Dev Team

Resource Requirements

Development Team

Role Count Commitment
Rust Developer 1-2 Full-time
Security Engineer 1 Part-time (Phases 1, 3, 4)
QA/Test Engineer 1 Part-time (Phases 2, 3, 4)

Infrastructure

Resource Purpose Notes
Development Server Code development Ubuntu 22.04 LTS
Test Servers Multi-distro testing Ubuntu, Debian, RHEL, Alpine, Arch
CI/CD Runner Automated testing GitHub Actions or self-hosted
Internal CA Certificate issuance Separate secure host

Tools & Services

Tool Purpose Cost
Rust Toolchain Development Free
cargo-audit Security scanning Free
Git/Gitea Version control Self-hosted
Wireshark Network analysis Free
Burp Suite Security testing Community (Free)

Success Criteria

Phase 0 Success

  • Cargo project builds without errors
  • All dependencies resolved
  • Code quality tools configured and passing

Phase 1 Success

  • CI/CD pipeline runs on every commit
  • Test framework operational with >95% coverage target
  • Internal CA operational with test certificates

Phase 2 Success

  • All 15 API endpoints functional
  • mTLS authentication working
  • IP whitelist enforced
  • WebSocket streaming operational
  • Audit logging complete
  • Unit test coverage >95%

Phase 3 Success

  • Penetration testing complete with all critical findings resolved
  • Threat model validated
  • Security documentation complete

Phase 4 Success

  • Performance benchmarks met
  • Documentation complete
  • Package builds (.deb, .rpm) successful
  • UAT sign-off received
  • v1.0.0 released

Following kiro spec-driven development standards